Maven runs all the life cycle phases before the phase that is being executed? code example
Example: maven lifecycle
-CLEAN- Cleaning up the target folder
-VALIDATE - validating the project is correct and
all necessary information is available
-COMPILE - compiling the source code of the project
-TEST - test the compiled source code
using a suitable unit testing framework.
These tests should not require
the code be packaged or deployed
-PACKAGE - taking the compiled code and package
it in its distributable format, such as a JAR.
-VERIFY - running any checks on results of
integration tests to ensure quality criteria are met
-INSTALL - install the package into the
local repository, for use as a dependency
in other projects locally
-DEPLOY - done in the build environment,
copies the final package to the remote
repository for sharing with other developers and projects.